It is already congested today, and it could get more congested.” ![]() “You have a limited number of lanes on the 91 between the 241 and the 71 (freeway), and now we are going to introduce more traffic into that?” said Kia Mortazavi, the OCTA’s executive director of planning. “You create another on-ramp. The connector would have an additional toll, according to the TCA. The toll for taking the entire 241 at the lowest price is $6.63. Tolls for taking the entire 18-mile 91 Express Lanes range from $3.45 on off-hours to up to $15.70 during the one-hour peak commuter time, eastbound at 3-4 p.m. From there, it runs another eight miles in Riverside County to the I-15. ![]() The 91 Express Lanes is 10 miles long in Orange County, with the only exits and entrances at each end – near the 55 freeway and the county line. They worry that the project could result in a chaotic mix of 241 toll road drivers merging onto the 91 Express Lanes, and drivers in the Express Lanes preparing to exit at the county line for the 91 freeway while at the same time others are jumping onto the Express Lanes. ![]() The Transportation Corridor Agencies touts the 241/91 connector as a way to decrease congestion, create greater efficiency for toll lanes, and improve safety. The project would create a clear shot from the 241, which runs between south and north Orange County along its eastern side, to the 91 Express Lanes that roll along the middle of the 91 freeway into Riverside County, bypassing typical freeway traffic the entire route for those willing to pay tolls. “We are very concerned about the impact the project will have on (91) corridor travelers who have borne construction delays as well as increasing traffic volume in the corridor,” that agency’s executive director, Anne Mayer, wrote in a recent letter to 241 toll leaders. Leaders of the Riverside County Transportation Commission have raised similar concerns about the elaborate ramp increasing traffic and congestion. SANTA ANA – Orange County Transportation Authority staffers fearful of increased congestion on the 91 freeway and the adjacent 91 Express Lanes want 241 toll road leaders to pump the brakes on plans for a $180 million ramp linking the 241 and the Express Lanes.Īnd an executive committee, comprised of seven OCTA board members, on Monday backed that opposition, preferring that the Transportation Corridor Agencies, which manages the 241, to defer any work on the planned connector. Motorists can get up-to-date information on the closure at, or at. Operations may conclude before the scheduled time on Monday, depending on conditions. Officials noted the westbound on- and off-ramps at Main Street, as well as the Lincoln exit ramp, will be closed within the roughly mile-long closure zone. Work is in the wrap-up stage, though completion has been delayed by inclement weather.Ī detour will be available this weekend, taking motorists to the westbound Pomona (60) Freeway via I-15, after which they can return to Corona via the Corona (71) Expressway, or proceed into Orange County via state Route 57. ![]() The refresh project, which started last summer, entails resurfacing lanes, modifying retaining walls and repairing concrete barriers on both sides of the 91. This weekend, crews will be removing old support beams, according to RCTC. The connector project, which began in April 2021, is expected to be completed in months. Officials said the current closure is required for ongoing operations connected to the $12.6 million “91 Refresh Project” and the $270 million “15/91 Express Lanes Connector Project.” The latter involves erecting two new connector bridges to transition traffic from express lanes on the eastbound 91 to northbound I-15, and from southbound I-15 to the westbound 91. Only the December shutdown impacted westbound travel. Monday, according to the Riverside County Transportation Commission.įour prior weekend shutdowns occurred in September, October and December. Friday between Interstate 15 and Lincoln Avenue, with all five lanes out of service until 5 a.m. The full westbound closure is scheduled to start at 10 p.m. CORONA (CNS) – The westbound Riverside (91) Freeway in downtown Corona is slated to be shut down Friday evening and through this weekend to enable crews to remove structural supports for one project, as well as perform roadway resurfacing for another, and motorists were advised to plan ahead to avoid lengthy travel delays.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |